Check and Verify Inspection Points (D)

Prior to this workflow, the checklist must be created by attaching the ITP to the Lot.

Note: You will require access and authority to check and verify Checklist (inspection points) as assigned by your CivilPro Administrator.

Relevant Links:

Create Checklists - Attach ITP to Lots (D)

1. Navigate to the Checklist register

Check_and_Verify_Inspecttion_Pt_1_.png

2. Double-click on the selected Lot/ITP, to view the inspection items. Alternatively, right-click on the selected item and select "View Checklist" from the dropdown list.

Check_and_Verify_Inspecttion_Pt_2_.png

3. Before you can edit, you must “Enable Editing” in your register. Right-click on a row to select “Enable Editing”. Alternatively, click on the “Enable Editing” icon at the bottom of the page.

Check_and_Verify_Inspecttion_Pt_3.png

4. Tick the boxes relevant to each ITP item, and enter any comments in the "Comment" column if applicable.

Tip: If you are ticking off many items all at once, you can select multiple rows (Ctrl + Select) and click on the "Check selected" and/or "Verify selected" on the top toolbar. 

Note: Items that have all their boxes ticked off, with nothing outstanding will be highlighted in green.

Check_and_Verify_Inspecttion_Pt_4.png

5. To download an electronic checklist or to print a field complete checklist, click on the “Reports” tab on the top toolbar. Click on “Electronic Checklist” or “Field Complete Checklist” to download and print.

Notes:

a) The Electronic Checklist is generated to show the current status of the checklist and is primarily used for distribution or record-keeping.

b) The Field Complete Checklist is printed for completion and signed off by the responsible persons on the hard copy. It has a section for signing off by the Responsible Officer and Verifying Authority which is excluded in the Electronic Checklist.

Check_and_Verify_Inspecttion_Pt_5.png

Was this article helpful?
0 out of 0 found this helpful

More Resources

  • Watch Demo

    See how CivilPro supports smarter, more efficient Project and QA management

  • Contact Hours:

    8:30am - 5pm AEST Monday to Friday; Closed on Saturday and Sunday

  • Follow Us

    Stay connected - follow us on LinkedIn for updates, tips and announcements